A commercial property submission can contain hundreds of pages, but the statement of values is often where the underwriter starts. It puts the buildings, construction details and insured values in one place. Errors in that spreadsheet can affect a quote, a catastrophe model run or recovery after a loss. Below are the fields to check and the records that support them, followed by a free 51-column Excel template.
What a statement of values is, and who reads it
A statement of values (SOV), also called a schedule of values or property schedule, lists every insured location and building with its physical characteristics and the dollar values the insured wants covered. One row per building. For a single-building risk it can be a few cells on an application. For a REIT or a manufacturer with 300 sites it is the core of the submission.
Four groups use the schedule for different purposes:
- Brokers build and maintain it, and use it to market the account. A complete, consistent SOV gets more carriers to quote.
- Carriers price from it. The underwriter rates each building on its COPE profile (construction, occupancy, protection, exposure; see what COPE data is), and the limit, deductibles and sublimits all key off the values.
- Risk managers at the insured own the values. The schedule is their statement of what they believe the property is worth, and it follows them into every claim.
- Reinsurers and cat modelers take the SOV, geocode it, and run it through catastrophe models to estimate probable maximum loss. The model can only be as good as the rows it is fed.
The SOV is usually an attachment to the application, and many carriers take it on their own template, so the column order changes from market to market. The content does not.
Location & ID | Construction | Secondary modifiers | Occupancy & protection | Exposure & CAT | Valuation | ||||||||||||
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Loc # | Bldg # | Street Address | St | Year Built | Construction Type | Building Area | Stories | Roof Type | Roof Year | Property Type | Sprinklers | Dist to Fire Station (mi) | Flood Zone | Ground Elevation (ft) | Building Value | Business Income | Total Insured Values |
| 1 | 1 | 100 Example Pkwy | TX | 1998 | Joisted masonry (2) | 42,000 | 2 | TPO membrane | 2019 | Office | Yes | 1.4 | X | 512 | $9,450,000 | $1,800,000 | $12,350,000 |
| 1 | 2 | 100 Example Pkwy | TX | 2006 | Non-combustible (3) | 18,500 | 1 | Metal | 2006 | Warehouse | No | 1.4 | X | 509 | $2,960,000 | $0 | $3,710,000 |
| 2 | 1 | 25 Sample Ave | FL | 1974 | Masonry non-comb. (4) | 61,200 | 4 | Built-up | 2008 | Apartments | No | 3.2 | AE | 7 | ? | ? | ? |
The columns, group by group
COPEData's SOV export uses 51 columns, the layout of a working broker schedule. They fall into six groups. Hover or tap any column below for a one-line definition; a filled swatch means COPEData fills it automatically from public records, permits and web research (when a source is found), and a hollow one means it is left for the broker or insured.
Location and identification
| Column | What goes in it | Where it comes from |
|---|---|---|
| Loc # / Bldg # | Location and building number. One location, many buildings. | Your numbering. Keep it stable across renewals so loss runs and inspections line up. |
| Street Address, City, St, Zip | The physical address of the building, not the mailing address. | Leases, deeds, the insured's property list. Format ZIP as text so leading zeros survive. |
| Property Name | Common name or main tenant. | The insured. |
| APN / Parcel ID | Assessor's parcel number. | County assessor. The cleanest key for joining to public records. |
| Property Owners | Owner of record. | Assessor or recorder. A mismatch with the named insured is worth a question. |
Verify the address for each building before submitting the schedule. Catastrophe models geocode each row, and Verisk includes “missing or inaccurately geocoded exposure data” in its quality checks (Verisk, Data Quality Analytics in Touchstone). A location resolved only to a ZIP centroid may sit a mile from the actual building, potentially placing it on the wrong side of a flood or wildfire boundary.
Construction
| Column | What goes in it | Where it comes from |
|---|---|---|
| Year Built | Original construction year. | Assessor records, permits, appraisals. |
| Construction Type | ISO class 1–6, or the carrier's code. | Inspection reports, appraisals, assessor building class. See ISO construction classes. |
| Building Area | Gross square feet. | Assessor, appraisal, rent roll. |
| Stories | Stories above grade. | Assessor, listings, street imagery. |
| Buildings | Buildings on the parcel. | Assessor, aerial imagery. |
| Foundation | Slab, crawlspace, basement, piers. | Inspection, assessor, elevation certificate. |
| Lot Size | Parcel area. | Assessor. |
Construction type and year built are the two primary characteristics every model and every rating plan asks for. Year built stands in for the building code in force when it was designed, which matters a great deal for wind and earthquake.
Secondary modifiers: roof and systems
| Column | What goes in it | Where it comes from |
|---|---|---|
| Roof Type | Covering: TPO, EPDM, built-up, modified bitumen, metal, shingle, tile. | Inspection, roofing permits, imagery. |
| Roof Year / Roof Updates | Year the current covering went on, and the history. | Roofing permits, contractor invoices. |
| Electrical / Wiring Year and Updates | Last service or panel upgrade; age of the wiring. | Electrical permits. |
| Plumbing Year and Updates | Last repipe or major plumbing work. | Plumbing permits. |
| Heating Year and Updates | Last HVAC replacement. | Mechanical permits. |
| Boiler on Premises | Yes or no. | Inspection, the insured. |
Roof and system details help distinguish buildings with the same construction class and year built: a 1985 office with a 2021 reroof is a different wind risk from one still on its original roof. Verisk's Touchstone, for example, carries Roof Year Built as its own field, separate from the building's year built, and documents roof covering as a secondary characteristic for its U.S. hurricane, severe thunderstorm and wildfire models (Touchstone 11.0, location roof detail fields). Missing details trigger model defaults, which can change the loss estimate. Confirm them where records are available.
The fastest source for update years is building permit history. A reroof, a service upgrade or a repipe almost always pulled a permit.
Occupancy and protection
| Column | What goes in it | Where it comes from |
|---|---|---|
| Property Type | Occupancy: office, multifamily, retail, warehouse, manufacturing. | The insured, leases, assessor use code. |
| # of Units, pools, fitness, courts, parking, amenities | Habitational and amenity exposure. | Listings, rent roll, site visit. |
| Sprinklers | Yes or no, ideally % of floor area protected. | Inspection, fire marshal records, permits. |
| Alarm, Security Features | Fire/burglar alarm type, guards, access control. | Inspection, the insured. |
| Crime Score | Area crime index, if your carrier asks for one. | Third-party data; broker fills. |
| Dist to Fire Station, Nearest Fire Station, Fire Station Type | Responding station, distance, career or volunteer. | USGS structures data, fire department sites. |
| Distance to Hydrant | Feet to the nearest hydrant. | Municipal water GIS where published. |
Pick one occupancy vocabulary and use it on every row. "Office," "Professional office," "OFF" and "Commercial" on the same schedule look like four occupancies to a model that maps text to codes.
Exposure and CAT
| Column | What goes in it | Where it comes from |
|---|---|---|
| Flood Zone | FEMA zone: X, A, AE, VE, etc. | FEMA National Flood Hazard Layer. See FEMA flood zones explained. |
| Nearest Flood Zone Edge | Distance to the nearest Special Flood Hazard Area. | Measured from NFHL polygons. |
| FEMA NRI Risk Rating, Top Hazards | Tract-level composite rating and highest-rated hazards. | FEMA National Risk Index. See the NRI guide. |
| Ground Elevation | Feet above sea level at the building. | USGS elevation data. |
Carriers and modelers usually derive these fields from the geocode. Including them in the schedule gives you a chance to check the result beforehand, especially for locations near a flood-zone boundary.
Valuation
| Column | What goes in it | Where it comes from |
|---|---|---|
| Building Value | Replacement cost to rebuild, not market value, not assessed value. | Appraisal, cost estimating software, insured's engineers. |
| Contents / BPP | Business personal property: furniture, fixtures, equipment, inventory, tenant improvements the insured owns. | Fixed asset ledger, inventory records. Many schedules add this as its own column. |
| Business Income | 12-month loss of net income plus continuing expenses. | The business income worksheet, prepared with the insured's finance team. |
| Total Insured Values / Total TIV | Row total, and the roll-up for the schedule. | Formula. Must tie to the declarations. |
COPEData leaves all of these blank. It does not estimate replacement cost; valuation is the insured's representation and belongs with whoever can stand behind it.
View data
| Part | Value | Share |
|---|---|---|
| Building (replacement cost) | $9,450,000 | 76.5% |
| Contents / BPP | $1,100,000 | 8.9% |
| Business income (12 months) | $1,800,000 | 14.6% |
Which columns matter for which peril
Prioritize missing fields according to the relevant peril. Sprinkler details are important for fire; roof covering and age matter for hail. For flood, concentrate on location, elevation and foundation. The matrix below shows where to focus a review before a submission deadline.
Address quality matters across the hazards because it places the building within the model. Fire review also depends on construction, occupancy and protection. Wind, hail and wildfire assessments draw heavily on the building envelope, especially the roof. Flood assessment requires zone, distance, elevation and foundation details.
Insurance to value and the coinsurance penalty
Insurance to value (ITV) is the ratio of the limit you carry to what the property would actually cost to replace. When it slips below 100%, two things happen. The obvious one is that a total loss is not fully paid. The less obvious one is the coinsurance clause, which can cut a partial loss too.
IRMI defines a coinsurance provision as one that "penalizes the insured's loss recovery if the limit of insurance purchased by the insured is not equal to or greater than a specified percentage (commonly 80 percent) of the value of the insured property" (IRMI). The recovery is capped at:
Recovery = Loss × (Limit carried ÷ (Value at time of loss × Coinsurance %)) − Deductible
and never more than the loss itself or the limit. Two details trip people up. The value is measured at the time of loss, not at binding. And the test applies per building or per item as the policy defines it, so one undervalued building in a schedule can be penalized even when the total looks fine.
Business income has its own version of the test. BI coinsurance is measured against a projection of net income plus operating expenses over the coming 12 months, which is why the BI worksheet exists and why a back-of-envelope BI figure on the SOV is dangerous.
Why valuations go stale
Building values do not hold still. A replacement cost that was right three years ago can be badly short today, because the cost of the materials and services that go into a building has moved much faster than general inflation.
- +56.6%
- Construction input prices
- +29.3%
- Consumer prices
- 2×
- Gap
View data
| Construction inputs (PPI) | Consumer prices (CPI-U) | |
|---|---|---|
| 2010 | 93.1 | 92 |
| 2011 | 99.7 | 94.9 |
| 2012 | 101.6 | 96.9 |
| 2013 | 102.7 | 98.3 |
| 2014 | 104 | 99.9 |
| 2015 | 100 | 100 |
| 2016 | 98.3 | 101.3 |
| 2017 | 102.4 | 103.4 |
| 2018 | 109.3 | 105.9 |
| 2019 | 109.4 | 107.9 |
| 2020 | 107.9 | 109.2 |
| 2021 | 128.3 | 114.3 |
| 2022 | 151.9 | 123.5 |
| 2023 | 150.8 | 128.6 |
| 2024 | 151.6 | 132.4 |
| 2025 | 154.4 | 135.8 |
| 2026* | 164.9 | 140 |
Review schedules that used a flat 3% annual increase through 2021–2022 against the cost changes shown above. A valuation carried forward from that period may need an appraisal or cost-estimator update, particularly if it has gone three to five years without one.
Common SOV mistakes
Check for these errors before sending a schedule to market.
- Stale values. The single most expensive mistake, for the reasons above. Trend annually with a construction cost index, and re-appraise on a cycle.
- Market or assessed value in the building column. Market value includes land and reflects rents; assessed value reflects tax policy. Neither is the cost to rebuild.
- Missing secondary modifiers. Blank roof year, blank sprinkler column. The model defaults, the underwriter assumes the worst, and the rate shows it.
- Inconsistent occupancy and construction codes. Free text in a coded field, three spellings of the same thing, or an ISO class that contradicts the narrative (a "fire resistive" wood-frame apartment).
- Geocoding problems. PO boxes, ranges ("100–140 Main St"), intersections, campus addresses for 12 buildings, or rural routes that only match to a ZIP centroid. Give each building a real address, or coordinates if the address will not resolve.
- Campuses collapsed into one row. A business park entered as one building with combined square footage. The model sees one big building instead of six separate ones, which changes both the fire and the cat picture.
- Totals that do not tie. The TIV on the SOV, the TIV on the application and the limit on the dec page should all reconcile. Underwriters check.
- Implausible combinations. Verisk's validation rules exist because portfolios contain things like "seven-story wood frame buildings" or "a mobile home with a replacement value of $200,000" (Verisk). Sort by each column once before sending and look at the extremes.
How carriers and cat models use the data
The underwriter reads the SOV row by row for the big locations, and in aggregate for the rest. Construction and occupancy set the base fire rate, protection modifies it, and values set the exposure. Deductibles, wind and flood sublimits, and the decision to quote at all come out of that read.
The cat modeling team does something more mechanical. The schedule is imported, geocoded, mapped into the model's construction and occupancy codes, and run against a stochastic catalog of events to produce average annual loss and probable maximum loss at various return periods. In Verisk's description, its exposure dashboard breaks a portfolio down "by occupancy and construction, building age and height, geocode quality," and validation checks "identify exposures for which building characteristics are unknown" (Verisk). That output goes into pricing, into the carrier's accumulation management, and into what the carrier's reinsurers see.
Two practical consequences:
- Unknowns cost money. When a characteristic is missing, the model falls back on an assumption about what is typical for the area, and the underwriter loads for the extra uncertainty. Typical is rarely the well-maintained, recently reroofed building your insured actually owns.
- Better data is a negotiating tool. A complete schedule with documented roof years and sprinkler coverage lets the underwriter credit what is really there. Verisk's own pitch for its data quality score is that it "quantifies the improvement... that is possible with better exposure data quality."
How to build an SOV, step by step
- 1List every buildingStart from leases, deeds and the fixed asset register. One row per building, with a real street address.
- 2Fill COPE from recordsAssessor, permits, FEMA and USGS data for construction, roof, systems, protection and exposure fields.
- 3Get values from the insuredReplacement cost from an appraisal or cost estimator, contents from the asset ledger, BI from the worksheet.
- 4Normalize and checkOne code list per column. Sort each column, check extremes, make the totals tie.
- 5Date it and keep itRecord the valuation date and source per row. Trend values every renewal.
The second step is where most of the hours go, and it is the step COPEData automates: type an address and in about a minute you get a cited report covering construction, occupancy, protection, exposure and permit history, with every value linked to its source. The SOV export drops those values straight into the 51 columns above and leaves the valuation columns blank for the insured to complete. If you are building the schedule by hand, start from the template below.
SOV checklist before you send it
- Every row has a street address that geocodes to the rooftop, not the ZIP.
- Construction type uses one code system (ISO 1–6 or the carrier's) on every row.
- Roof type and roof year are filled for every building; update years for electrical, plumbing and HVAC where known.
- Sprinkler status is filled, with percentage of area where partial.
- Building values are replacement cost, dated, and trended to the policy inception.
- Contents and BI are separate from building, and BI matches the worksheet.
- The row totals sum to the schedule TIV, and the schedule TIV matches the application.
- Flood zone is checked for every building, especially anything near water.